Project Description

Scaffold erected at Royal Perth Hospital to replace damaged Brickwork. Scaffold had to be engineered prior to being built.

Scaffold was built on the 13th floor (33m up) drilled into the concrete floors and ceilings then punched out through the windows and cantilevered to both roofs. A final 1.2×1.2 bay was hung off the beams to get to lower areas.